My
Yucca 'Bright Star' signifying how I feel these days:
|
The largest of my 3 plants once again has its leaves stuck overhead, covering its core |
Our home remodel continues. Progress often seems very slow, partly because much of what's been done doesn't have significant visual impact, like the installation of a new electrical panel and the rewiring that involved. Or the installation of the new HVAC system, now 80% done. But yesterday we finally got drywall installed in the new kitchen.
|
This is what the kitchen looked like back in early July during demolition |
|
This is yesterday's view after the drywall finally went up |
|
The new windows were installed in early August |
|
The indoor BBQ to the right of the chimney was removed in July but fixing the holes in the roof created as a result of downsizing the chimney took time. The interior wood roof got sandblasted last week. We still have to work out the details for recladding the fireplace. |
|
This is the outside view. There's a whole new (and shockingly expensive) roof, as well as siding for the kitchen, still in the offing. |
The cabinets could be here next week, which will mark a major turning point. I'm still not betting on being done until late December but at least I can relax a bit.
|
The Yucca required some help to loosen up. Loosening myself up requires drilling a little deeper into my own psyche seeking patience. |
For more Wednesday Vignettes,
visit Anna at Flutter & Hum.
All material © 2012-2019 by Kris Peterson for Late to the Garden Party